Skip to content

Commodity Repricing for Epicor BisTrack

Replacement cost worked out from the latest receipts in BisTrack and this week’s vendor quotes, laid against the current sell prices by category and your margin floor. The proposed changes and the open quotes they touch, for the person who owns pricing to update in BisTrack.

Purchasing & inventoryUpdated Oct 202620 ERPs

See it work on BisTrack.

Click through the steps. Fictional data, in BisTrack’s terms; the real thing runs on BisTrack.

Pricing · week of Oct 20 · commodities
Illustrative
Groups moved2 of 5Past your 3% threshold
Items under floor24At this week’s replacement cost
Open quotes touched11$86,400 at the old prices
SPF replacement cost+7.8%Receipts Oct 14 to 16, quotes Oct 20
GroupItemsRepl. costMargin nowFloorStatus
SPF studs6+7.8%17.2%22%Under floor
SPF plate and lengths18+5.1%20.4%22%Under floor
Treated14+0.6%26.0%24%Hold
OSB and plywood9−3.4%29.8%24%Room to come down
LVL and I-joist110.0%27.5%25%Hold
Replacement cost is arithmetic on BisTrack’s receipts and this week’s quotes, per item.

Replacement cost from last week’s receipts and Monday’s quotes, against the sell and the floor. Two groups moved.

1 / 4

The problem, as it happens in BisTrack.

Framing lumber and panels move every week, and the sell price in BisTrack moves when someone gets to it. The buyer has the mill quotes in email, the last receipt cost on the product record is from two weeks ago, and the price change gets worked out on a spreadsheet on Friday afternoon, by category, with a percent applied across the board. Studs, plate, 2x10 and OSB all get the same bump whether they moved or not.

Nobody tracks the week the market went up and the price didn’t. The counter sold 2x4 studs for four days at a margin that was gone, the pro desk honoured a quote written at last month’s cost, and the gross margin on framing for the month is off by points nobody can explain. When the market drops it goes the other way: the price stays high and the contractor buys across town.

How it works.

  1. 1

    Replacement cost, this week

    For every commodity item: the cost on the latest receipts in BisTrack, the vendor quotes that came in this week by email or file, and the cost on open POs not yet received. Replacement cost is what you could buy it for today, per item.

  2. 2

    Laid against your sell prices

    Each item’s current sell at every price level, the margin on it at replacement cost, and your margin floor for the category. An item under the floor, or a category that moved more than your threshold, is on the list. One that didn’t move is left alone.

  3. 3

    The change proposed, by group

    New sell prices proposed per item, rounded to your price points, grouped the way the yard thinks: SPF studs, plate and lengths, treated, OSB and plywood. Beside each group, the open quotes written at the old price and what they are worth.

  4. 4

    The person who owns pricing updates BisTrack

    Accept a group, change a number, hold a group until Monday. The accepted prices go into BisTrack as a BisTrack import where one exists, or keyed by your team from what Lunica prepared, and the quotes at risk are listed for the sales desk to call.

How it connects to BisTrack.

Lunica reads the product record for the commodity categories, receipts with their cost by item and date, open purchase orders and their costs, the price levels and current sell prices, and open quotes with the items on them through a read-only login to the BisTrack SQL Server database and its reporting views. Vendor quotes arrive by email or file at an address you set up and are read by a model for the items and prices on them.

Nothing is changed in BisTrack on its own. The proposed prices are a list the person who owns pricing accepts, edits or holds, and the accepted ones go back as a BisTrack import where one exists, or keyed by your team from what Lunica prepared. The open quotes affected are listed for the sales desk, and a note to a customer whose quote is expiring is a draft until a person sends it.

What a week looks like.

  • Replacement cost known per item on Monday, from your own receipts and quotes.
  • Prices proposed where the market moved, left alone where it didn’t.
  • The open quotes written at the old cost listed before the price changes.
  • The margin on framing explained week by week, not reconstructed at month end.

Questions

Does it change prices in BisTrack?

No. The proposed prices are accepted, edited or held by the person who owns pricing, and the accepted ones go into BisTrack as a BisTrack import where one exists, or keyed by your team from what Lunica prepared.

Where does replacement cost come from?

Your own receipts in BisTrack, the vendor quotes that came in this week, and the cost on open purchase orders. It is not a published index; it is what you could buy the item for today.

Can we use a market index too?

If you subscribe to one, it can be read as a file beside your quotes. It informs the proposal; your receipts and quotes decide it.

What about open quotes?

Every open quote with an affected item is listed with the item, the old price and the new, and what the quote is worth. The sales desk decides whether to honour it or call the customer, and a note to the customer is drafted and sent by a person.

Does it price by length and grade?

Yes. Each length and grade is its own item in BisTrack and is priced on its own replacement cost. A group is only a way of reading the list; the proposal is per item.

How often does it run?

Weekly by default, or whenever a vendor quote arrives that moves a category past your threshold. You set the day and the threshold.

What does the model see?

The vendor quote being read, and the rows behind one proposal when someone asks why. The replacement cost and the proposed prices are arithmetic on BisTrack’s numbers, not a model’s guess.

Does it need a server?

Lunica runs on one Windows server inside your network, beside BisTrack’s SQL Server, set up and maintained by Lunica. It reads Epicor BisTrack through a read-only login to the BisTrack SQL Server database and its reporting views. There is no inbound connection from outside your network.

What does Lunica read in BisTrack?

The customer record, open items and terms, purchase orders and receipts, the product record, quotes and order history, as each workflow needs them. Read-only, and only the rows a task is about.

Can it post to BisTrack?

Nothing lands in BisTrack without a person. What belongs in BisTrack goes back as a BisTrack import where one exists, or keyed by your team from what Lunica prepared.

What about our documents?

Invoice copies and scans keep living in BisTrack Document Management. Lunica reads them when a workflow needs one and never writes to them.

The same workflow, on another ERP.

Commodity Repricing is written for every system on the list. You’re reading the BisTrack version.

See it on your BisTrack data.

Thirty minutes. We walk the workflow on BisTrack data, then map it to yours.