Skip to content

Delivery Scheduling for Dancik Navigator

Orders ready to ship in Dancik, the windows customers asked for, and the trucks and drivers you have tomorrow, laid out as a plan by truck and stop. The dispatcher moves stops and confirms, and enrolled customers are told their window.

Dispatch & deliveryUpdated Oct 202620 ERPs

See it work on Dancik.

Click through the steps. Fictional data, in Dancik’s terms; the real thing runs on Dancik.

Tomorrow · orders ready to ship in Dancik
Illustrative
OrderCustomerJobWeightWindowStatus
SO 88455Pine Hollow ContractorsElm Ridge phase 26,840 lbBy 8 amPicked
SO 88462Harbor Point BuildersMaple St duplex11,200 lbMorningPicked
SO 88470Cedar & Stone FramingLot 14 Birchwood4,150 lbAfter 1 pmPicking
SO 88471Oak Hill BuildersRoute 9 warehouse18,600 lbAnyPicked
SO 88474Mill Creek CarpentryShop delivery920 lbAnyPicked
5 orders, 41,710 lb · weights from the item master · windows from order notes and customer requests

Everything with a delivery date of tomorrow, with weights from the item file and the window each customer asked for.

1 / 4

The problem, as it happens in Dancik.

Tomorrow’s deliveries are a stack of pick tickets, a whiteboard, and what the dispatcher knows about every jobsite. The orders are in Dancik with a requested date and a ship-to, but the window the contractor asked for is on a sticky note, the weight is a guess, and whether the boom truck can get into the Lot 14 cul-de-sac is in the dispatcher’s head.

So the plan is rebuilt from scratch every afternoon, and it’s only as good as who’s at the board. When the dispatcher is out, trucks leave half-loaded, two go to the same side of town, and the crew that was promised first thing gets the truck at two.

How it works.

  1. 1

    Orders ready to ship are gathered

    Each order in Dancik with a delivery date of tomorrow, picked or pickable, with its ship-to, its lines, the weight by line from the item master, and the window the customer asked for, from the order note or the request they sent.

  2. 2

    The day is laid out by truck and stop

    The trucks and drivers on tomorrow’s roster, the weight and length each truck can carry, and the stops grouped by area and window. Jobsite notes from past deliveries ride with each stop: gate code, boom access, where to drop.

  3. 3

    The dispatcher moves stops and confirms

    The plan opens on the board. Drag a stop to another truck, swap the order, pull one for the counter to call about. When it looks right, the dispatcher confirms the day and the run sheets go to the drivers.

  4. 4

    Customers are told their window

    Customers enrolled for delivery notices get a text or email with their window, sent by a person or on the schedule they chose. The counter calls the ones who aren’t enrolled, from the same list.

How it connects to Dancik.

Lunica reads open orders, ship-to addresses, order lines and the item master for weights and lengths, the customer master for delivery contacts, and whatever delivery schedule Dancik keeps, through ODBC to the Dancik database on IBM i, under a profile that can only read. Trucks, drivers and jobsite notes are kept in Lunica; the model reads the order notes and the customer’s request to find the window they asked for.

Nothing is written to Dancik by Lunica and nothing is sent on its own. The confirmed plan is a run sheet for the drivers and, where Dancik keeps a truck or a delivery date on the order, it goes back as a Dancik import where one exists, or keyed by your team from what Lunica prepared. Delivery notices go only to customers who enrolled, sent by a person or on the schedule they chose.

What a week looks like.

  • Tomorrow’s plan on the board by two, with weights and windows, before anyone draws it.
  • Stops grouped by area and window, trucks loaded to what they can carry.
  • Jobsite notes on every stop, not in one person’s head.
  • Enrolled customers told their window the afternoon before.

Questions

Does it dispatch the trucks?

No. It lays out a plan from the orders and the roster. The dispatcher moves stops, confirms the day, and the plan becomes the run sheet.

Where do weights come from?

From the item master in Dancik where a weight is kept, and from a per-unit table you maintain where it isn’t. Lengths are read the same way, so a 24-foot beam goes on a truck that can carry it.

Does it write to Dancik?

No. It reads the orders and the item master. Where Dancik keeps a truck or a delivery date on the order, the confirmed plan goes back as a Dancik import where one exists, or keyed by your team from what Lunica prepared.

Do customers get texted?

Only customers who enrolled for delivery notices, and only after the dispatcher confirms the day. A person sends the notice, or it goes on the schedule the customer chose.

What about same-day changes?

A new order or a cancelled one shows on the board as a change to the plan. The dispatcher drops it into a truck or leaves it for tomorrow; nothing moves on its own.

Does it route the trucks?

It groups stops by area and window and suggests an order. It is not a navigation app; the driver drives.

Does it need a server?

Lunica runs on one Windows server inside your network, beside the IBM i, set up and maintained by Lunica. It reads Dancik Navigator through ODBC to the Dancik database on IBM i, under a profile that can only read. There is no inbound connection from outside your network.

What does Lunica read in Dancik?

The customer master, open items and terms, purchase orders and receipts, the item master, quotes and order history, as each workflow needs them. Read-only, and only the rows a task is about.

Can it post to Dancik?

Nothing lands in Dancik without a person. What belongs in Dancik goes back as a Dancik import where one exists, or keyed by your team from what Lunica prepared.

What about our documents?

Invoice copies and scans keep living in Dancik’s document attachments. Lunica reads them when a workflow needs one and never writes to them.

The same workflow, on another ERP.

Delivery Scheduling is written for every system on the list. You’re reading the Dancik version.

See it on your Dancik data.

Thirty minutes. We walk the workflow on Dancik data, then map it to yours.